Don’t risk missing out on the ROC (Renewable Obligation Certificates) incentive! Schneider Electric has the solution.

- Minimize on-site electrical engineering
- All equipment compliant to UK regulations and approvals
- 2 or 3 station options to suit existing planning approvals
- 12 weeks lead time to site
- Includes customer and DNO switchgear availability (11 or 33kV connections)
(11kV = Ringmaster range)
(33kV = WS DNO & 33kV = Flusarc for Customer)