Schneider Electric 5MWp Solution

Don’t risk missing out on the ROC (Renewable Obligation Certificates) incentive! Schneider Electric has the solution.

 

5mpw-solution

 

 

 

 

 

 

 

 

  • Minimize on-site electrical engineering
  • All equipment compliant to UK regulations and approvals
  • 2 or 3 station options to suit existing planning approvals
  • 12 weeks lead time to site
  • Includes customer and DNO switchgear availability (11 or 33kV connections)

 

(11kV = Ringmaster range)
(33kV = WS DNO & 33kV = Flusarc for Customer)

 

 

 

Get more information about our 5MWp solution!

* indicates required
Subscribe to Conext Insider newsletter?